翻訳と辞書
Words near each other
・ Operational level of war
・ Operational loads monitoring
・ Operational maintenance
・ Operational manoeuvre group
・ Operational Medal for Southern Africa
・ Operational Medical Orderly
・ Operational Mentoring and Liaison Team
・ Operational Modal Analysis
・ Operational objective
・ Operational plan
・ Operational planning
・ Operational Programme Italy – Maritime France 2007 – 2013
・ Operational Reactor Safeguard Examination
・ Operational reporting
・ Operational Requirement
Operational Requirement F.155
・ Operational Research CONsultancy
・ Operational Research Society
・ Operational Response Group
・ Operational responsiveness
・ Operational risk
・ Operational risk management
・ Operational Security Systems
・ Operational semantics
・ Operational Service Medal
・ Operational Service Medal (Canada)
・ Operational Service Medal (United Kingdom)
・ Operational Service Medal for Afghanistan
・ Operational Service Medal for Sierra Leone
・ Operational Service Medal for the Democratic Republic of Congo


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Operational Requirement F.155 : ウィキペディア英語版
Operational Requirement F.155
Operational Requirement F.155 was a specification issued by the British Ministry of Supply for an interceptor aircraft to defend the United Kingdom from high-flying supersonic bombers.
Although a nuclear threat from Soviet nuclear-armed bombers was identified as early as in 1955, F.155 calling for supersonic interceptors (in service by 1962) was superseded by the 1957 Defence White Paper. The paper was a major review of military spending and one of its elements was the cancellation of nearly all manned fighter projects as a radical change had occurred in strategic threats with the expectation that intercontinental ballistic missiles and low-level strike would replace high flying bombers.

==Background==
During the early 1950s, the RAF's front line defence was converting from Gloster Meteor (a design that first flew during the Second World War) to Gloster Javelin all-weather fighters with the anticipation of new interceptors coming into service in the near-future. These included the English Electric Lightning (point defence interceptor) and Saunders-Roe SR.177 interceptors in development. While the Lightning embodied largely conventional jet engine technology, the SR.177 was a "mixed" rocket/jet design that used rocket power for delivering high speed and maximum altitude performance. Due to the length of design and development, for the interim the RAF also considered purchase of the Canadian Avro CF-105 Arrow projected to be operational by 1961.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Operational Requirement F.155」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.